[1]
Ogunfowora , A.R. et al. 2024. SOLVING THE ECONOMIC DISPATCH PROBLEM OF A TWO-AREA POWER SYSTEM CONSIDERING TRANSMISSION CONSTRAINT USING SEMI-DEFINITE PROGRAMMING. International Journal of Allied Research in Engineering and Technology (IJARET). 15, 5 (May 2024), 1–10. DOI:https://doi.org/10.5281/zenodo.11220277.